The chassis is now sitting on the frame table,but before it got here...
Kevin had to do a lot of sandblasting...he used32 fifty-five pound bags of 65 grade silica sand.
And then some more grinding.Here he is grinding away all the old repairs
on the apron between the doors and the tail.
See him in there...still grinding!
The car is upside down & this is what the underside of the rooflooked like just before the car was flipped back over.
Bret and Kevin carry it to...
the frame table where Bret gets to work on it.
Frame air pressure gaugeto check the chassis tubing for leaks.
Bret has started to repair the left sideof the frame for the luggage tray.
The level is laying on the tail so we can makesure the tail is level to the chassis.
Click on our latest youtube link to see:
No comments:
Post a Comment