A lot got done here while I was out of town for 4 days...
Here's just a taste of what was done and what is happening today.
The master cylinders were installed on the K8.Here's just a taste of what was done and what is happening today.
Andy prepared the floor of the 906 for the patches of fiberglass that will hold the floor to the chassis tubing. You can see that he has sanded the sections where the patches will be applied.
Kevin is applying the patches and Andy is spreading
cabosil between the floor and tubing for extra bonding.
cabosil between the floor and tubing for extra bonding.
Andy is working on one of the inner panels.
No comments:
Post a Comment